Summary
- We have added a much needed feature that allows PERT estimations to be registered for Scrum stories and be reflected on burn down charts. Now when you estimate a sub-task, it will add the estimates of all subtasks and assign that total as the original estimate of the story.
- The PERT calculator popup now displays the issue key and summary for easier trasability
- We have added a text area where an explanation can be given about the estimation entered
- Minor bug fixes such as time denomination was not marked when decimals were used.
ID | Type | Issue | Summary | Description |
---|---|---|---|---|
1 | Feature | PC-17 | Rollup total to parent task | Add a configuration option that will allow the user to enable or disable it. When enabled, if a user estimates a subtask using PERT, the total estimations of all the subtasks will be assigned to the story. This allows for the correct estimation of the story to be used in the Scrum turndown chart. |